Plants Relocation/ Shifting:

- Plant Machine/ Parts Identification No generation.
- Study of Wight and dimensions for machine move out.
- All machine PLC/ HMI backup preparation.
- Machine Dismantling schedule preparation.
- Machine Removable and Fragile parts study.
- Control Panel Wiring tagging.
- Machine Parts Tagging.
- Dismantling of Machine.
- Packing of Machines & Parts.
- Machine Move out as per the defined Box Sizes.
- In Installation – Unpacking of Machine.
- Plant Machines Installation Area preparation/ Marking.
- Plant Machines Installation.
- Plant Machines Refurbishments( Cleaning/ Painting/ Replacement of Broken Parts/ Re wiring).
- Plant Machines Control Panel Installation & Wiring.
- Plant Machines Hydraulics & Pneumatics Pipes Connections.
- Plant Machines Drawing Preparation.
- Plant Machines Power up and I/O testing, PLC troubleshooting.
- Plant Machines Manual Testing.
- Plant Machines Auto testing.
- Productions Trial and Handover.

Contact us ______________________________________________________________________________________________________________

PLOT NO.-A1/160, SWADESHI COMPOUND, SECTOR-17 INDUSTRIAL AREA, KAVI NAGAR GHAZIABAD-201002. Mobile: Mr S. K. Dixit: (+91)-9871374600,

Tel: (+91)-120-6495780/(+91)-9212137841-46 , E mail:-info@creative-group.co.in